Over-the-Counter Services

Over-the-Counter Permit Services in Florida

Extensions, revisions, contractor changes, certificates and the trips to the permit counter that eat up a workday. Hand them to us and keep your team on the job.

Get a Free Quote

The Permit Tasks Between Issuance and Final

Getting a permit issued is only part of the work. Over the life of a project, contractors change, plans get revised, inspections need scheduling and permits approach expiration. Our over-the-counter permit services in Florida cover these smaller but time-sensitive tasks, whether they are handled at a service window, through an online portal or both.

As with all of our work, we act as the authorized agent for the property owner or the licensed contractor. Fast Pass Permits does not hold a contractor license and does not pull permits under its own license. We prepare the paperwork, gather the required signatures and file it on your behalf.

Permit document being stamped and approved

Services We Provide

Certificate of Occupancy & Completion

Assembling final documents, approvals and inspection results so the department can issue the CO or certificate of completion.

Permit Extensions & Renewals

Requesting extensions before a permit lapses and renewing permits where the jurisdiction allows it.

Permit Revisions

Submitting revised drawings or scope changes on an active permit and tracking the revision through review.

Change of Contractor

Filing the forms, letters and signatures needed to transfer a permit to a new contractor of record.

Change of Architect or Engineer

Updating the design professional of record when a new architect or engineer takes over the drawings.

Change of Sub-Contractor

Replacing an electrical, plumbing, mechanical or roofing sub on an open permit.

Contractor Registration

Preparing and submitting the documents a municipality asks for before a contractor can work or file in that jurisdiction.

Inspection Scheduling

Requesting inspections, tracking results and following up on failed or partial inspections.

Sub-Permits

Filing trade sub-permits tied to a master permit for the licensed contractors doing the work.

Printing

Printing plan sets and documents in the sizes and quantities a department requires for paper submittals.

Notary

Notarization of permit applications, affidavits and authorization letters that require it.

Document Drop-Off & Pickup

Delivering documents to the building department and collecting approved plans, permit cards and certificates.

When These Services Make Sense

If a permit has already expired or been left open for years, the fix is usually more involved. Our open and expired permit resolution service is built for those cases.

How It Works

  1. Send the request. Tell us the permit number, address and what needs to happen.
  2. Receive a flat-rate quote. We confirm what the department requires and give you one price upfront.
  3. Sign and return. We prepare the forms and letters and tell you exactly which ones need your signature or a notary.
  4. We file it. We submit online or at the counter as your authorized agent and track it until it is processed.
  5. You get the result. We send the updated permit, approved revision, certificate or inspection result back to you.

Part of a Larger Project?

Over-the-counter tasks often come up on jobs we have already permitted, but we also take them on for permits filed by others. For new applications, see our residential permit expediting and commercial permit expediting services. If a revision needs updated sealed drawings, we can arrange them through licensed partners on our permit drawings page. Unusual approvals are covered under special permits.

Why Work With Fast Pass Permits

See how these services fit with everything else we do on our permit expediting in Florida page, or check a property’s history first with permit research.

Frequently Asked Questions

What is the difference between a certificate of occupancy and a certificate of completion?

A certificate of occupancy is generally issued for new buildings or changes of occupancy and confirms the space can be occupied. A certificate of completion is typically issued for work such as shell buildings or alterations. Which one applies depends on the project and the jurisdiction.

Can I extend a building permit in Florida before it expires?

Often, yes. Many departments allow an extension when it is requested before expiration and the reason is justified. Rules and fees vary, so we check the specific jurisdiction’s requirements first.

How do I change the contractor on an open permit?

Usually the new contractor submits a change of contractor application with the required signatures and documents, and sometimes a letter from the owner or the previous contractor. We prepare the package and file it on your behalf.

Do I need to register as a contractor with each city?

Some municipalities require contractors to register before filing permits there, while others do not. We confirm what the jurisdiction requires and prepare the registration package.

Can you schedule inspections for my permit?

Yes. With the appropriate authorization, we can request inspections, track results and let you know what is needed after a failed inspection.

Hand Off the Next Trip to the Permit Counter

Tell us what needs to be filed, changed or picked up, and we will reply with a flat-rate quote.

Request a Free Quote